Emergency DFTO Thermal Oxidizer Fabrication for Recycling Emissions
An oil recycling company in the Southwest needed a new thermal oxidizer shell ASAP. This case study shows how KKI came through despite supply chain challenges.
Problem
An oil recycler had a failing thermal oxidizer. The internally insulated shell was deteriorating and nearing failure. Since the sub-systems such as fans, gas train, controls, and dampers were functioning well, a shell-only replacement was the least disruptive option. Lead time was a major concern due to potential catastrophic failure of the shell as well as the uncertain availability of metal during the 2021 supply chain challenges.
Photos: In Progess
Click on a picture to enlarge
Solution
Kono Kogs was entrusted to fabricate, insulate and ship the replacement shell as quickly as possible, in hopes of a 6-8 week delivery. Steel and material needed for the shell manufacturing were secured prior to asking our customer to commit to the purchase. With the significant fabrication capability added at Kono Kogs since early 2021, including many modern forming and cutting machines and the great can-do attitude of our fabrication team, Kono Kogs was confident of success. We are grateful this first-time customer was willing to give us their trust.
Equipment & Services Provided
- Replacement thermal oxidizer combustion chamber
- Detailed design of all sub-system components
- Fabricate all components: shell, exhaust stack
- Mild steel and stainless steel components
- Base frame
- Internally insulated for 2200° F operation
- Emergency/expedited delivery
Results
The thermal oxidizer shell was ready to ship in under 6 weeks. This was a significant achievement considering the limited availability of drawings for this older system, and the 2021 supply chain challenges. Contact Kono Kogs for your emergency fabrication needs, machine assembly needs, and oxidizer repair & replacement needs.